
3 - 20
To find Follower Setpoint 1 (CP-03) for Example B:
Follower E.U. desired
Setpoint 1 =
________________________________
x 100 (%)
Lead E.U. operation
10 gal/min The Follower Engineering Units (gallons/minute of ingredient B)
at which you want the Follower to operate.
Divided by
20 gal/min The Lead Engineering Units (gallons/minute of ingredient A)
that the Lead is operating at.
Multiplied by 100 (%) Equals
50 Follower Setpoint 1 (CP-03) value.
To find Follower Setpoint 2 (CP-04) for Example B:
Follower E.U. desired
Setpoint 2 =
________________________________
x 100 (%)
Lead E.U. operation
7 gal/min The Follower Engineering Units (gallons/minute of ingredient B)
at which you want the Follower to operate.
Divided by
10 gal/min The Lead Engineering Units (gallons/minute of ingredient A)
that the Lead is operating at.
Multiplied by 100(%) Equals
70 Follower Setpoint 2 (CP-04) value.
Kommentare zu diesen Handbüchern